The process of laying in cable or assembling pipeline
at a desired depth. Normally this depth is below substrate and has
to be trenched in with a hand dredge.
Please scroll
down the web page to view photos of some of our
work...

210ft
of high pressure 8" water main installed under harbor at Fountain
Powerboats in 1998..